1. Submit plans before construction
The covenants require prior written ACC approval for improvements and for construction that changes an improvement’s exterior appearance, other than normal maintenance. Removing an improvement also requires approval. Interior styling is left to the owner.
Provide plans covering the location, dimensions, materials, colors, setbacks and other requested details. The ACC may postpone review until it has the information it needs and may inspect work in progress. Its review does not certify structural safety, engineering or building-code compliance.
Sections 1.25, 4.01, 4.05–4.06, 7.06 and 7.11.
2. Fit the wooded setting
Designs should suit the community’s country, wooded character. Wood, wood-like materials and stone are preferred; brick is excluded. Exterior colors should be warm earth tones that blend with the surroundings. Roofing must be composition or another material approved by the ACC. The ACC also approves the building setback and site plan.
Section 4.05.
3. Check fence and sightline requirements carefully
Fencing—including plantings used as a visual barrier—requires ACC approval. It must preserve the open wooded setting and minimize obstruction of neighbors’ lake views. Road and driveway sightlines must remain clear.
Section 4.04 lists detailed perimeter-fence standards, including matte black ornamental wrought iron with at least 75% open area, a maximum height of 6 feet, a minimum 60-foot setback from the lake property line and 10 feet from side property lines. It also specifies concrete footings, spacing, restrictions in front of the building line and sight triangles.
Pool enclosures and perimeter fences are expressly subject to applicable state-law requirements. Review the full section with the chair before choosing a fence design.
Section 4.04, including its exceptions and construction specifications.
4. Plan structures and waterfront work
Residential lots are for single-family residential use. Freestanding buildings such as detached garages, sheds and other outbuildings are prohibited, with an exception for ACC-approved boathouses.
Enclosed boathouses are prohibited. Boathouses, piers and docks must not obstruct another owner’s lake view. Bulkheads require ACC approval. Franklin County Water District requirements also apply.
Sections 3.11, 4.02, 4.11 and 10.10.
5. Include driveways, drainage and site details
- Driveways: the ACC approves their location. Section 4.10 specifies an 8-inch culvert where access crosses an existing road drainage ditch, kept clear of debris and dirt.
- Drainage: an owner’s changes to established drainage require adequate drainage provisions and ACC approval.
- Tanks and rainwater equipment: location and screening are subject to ACC review; Section 3.10 contains additional tank and water-system restrictions.
- Other installations: permanent basketball goals require approval. Signs and exterior antennas have approval requirements and specified exceptions.
- Lot divisions: consult the Association before changing lot boundaries or conveying part-lot interests; Section 3.01 contains approval requirements and exceptions.
Sections 3.01, 3.08–3.10, 3.15, 4.07 and 4.10.
6. Follow the approved plans during construction
Pursue construction with reasonable diligence and follow usual local construction practices. Keep debris under control; the covenants allow removal of excessive debris at the owner’s expense. The ACC may inspect work for compliance with approved plans.
Sections 4.08, 7.06 and 7.11.
7. Understand decisions, timing and exceptions
Section 7.09 provides for deemed approval of ordinary plans if the ACC does not respond within 20 days after receiving all required information. Variances follow a separate process. Confirm receipt and application status with the chair; the ACC rules quick guide explains the response-period calculation.
Denials are subject to notice, hearing and appeal requirements. Variances require an ACC recommendation and Board consideration under Section 7.08, which includes written-submission requirements and a 30-day deemed-grant provision if the Board does not issue a written denial. A variance applies only to the particular property and instance; a prior ACC decision does not establish approval for another project.
Sections 7.07–7.10. Consult the full declaration for these procedures.
Based on the November 23, 2025 adopted declaration. This summary focuses on ACC-related provisions; the full covenants, applicable law and other governing documents contain additional requirements.